Annual Fire Extinguisher Inspection
OverdueAll portable fire extinguishers must be inspected annually by a certified contractor per NFPA 10.
Sprinkler System Semi-Annual Test
Due SoonWet pipe sprinkler system inspection and flow test per NFPA 25.
Fire Alarm Panel Annual Certification
CompliantComplete inspection and testing of fire alarm control panel and all initiating devices.
AIM Act Refrigerant Leak Detection Installation
Due SoonEPA AIM Act HFC Management Rule requires automatic leak detection on systems ≥15 lbs refrigerant charge by Jan 1, 2027.
Boiler Annual Safety Inspection
OverdueAnnual boiler inspection by WA L&I certified inspector. Required for all steam and hot water boilers.
WA CBPS Tier 1 Compliance — Energy Management Plan
Due SoonBuilding exceeds 90,000 sq ft. Must submit Energy Management Plan to WA Commerce by June 1, 2027. Penalty: up to $5,000 + $1/sq ft/year.
Seattle Annual Energy Benchmarking Report
Due SoonAll buildings >20,000 sq ft must benchmark via ENERGY STAR Portfolio Manager and report to City of Seattle by July 1 annually.
WA CBPS Tier 2 Energy Benchmarking
Overdue42,000 sq ft school — Tier 2 building. Must benchmark and implement O&M program by July 1, 2027.
AHERA Asbestos 3-Year Re-inspection
OverdueAll K-12 schools must conduct asbestos re-inspections every 3 years per AHERA. Fines up to $25,000/day for non-compliance.
Lead Paint Inspection & Risk Assessment
Due SoonBuildings pre-1978 require lead paint inspection per EPA RRP Rule before any renovation work.
AHERA 6-Month Periodic Surveillance
OverduePeriodic surveillance of all asbestos-containing materials by AHERA-accredited inspector. Required every 6 months.
Lead in Drinking Water Testing
Due Soon5-year testing cycle required for all K-12 schools. Community notification required after results per RCW 43.70.835.
Indoor Air Quality Assessment
Due SoonAnnual IAQ walkthrough and assessment. Air Quality Response Plan required for wildfire smoke and HVAC failure events.
IPM Annual OSPI Report
OverdueAnnual Integrated Pest Management report filed with OSPI each spring. 48-hour pesticide notification required.
AHERA Annual Parent & Staff Notification
CompliantAnnual notification letter to all parents and staff about asbestos management plan. Must be distributed before school year starts.
Radon Testing
CompliantBiennial radon testing. EPA action level: 4 pCi/L. NRPP-certified operator required.
IPM Annual Audit
CompliantAnnual Integrated Pest Management audit. WSDA Pesticide Consultant License required for operator.
AHERA 3-Year Re-Inspection
CompliantFull re-inspection of all asbestos-containing materials by an AHERA Management Planner. Required every 3 years per 40 CFR Part 763.
Elevator Annual Safety Inspection
CompliantAll passenger elevators must receive annual safety inspection by WA L&I certified inspector.
ADA Accessible Restroom Compliance
OverdueRestrooms must meet ADA Standards for Accessible Design. Last audit found non-compliant grab bar spacing.
Electrical Panel 5-Year Inspection
CompliantMain electrical distribution panel inspection and thermographic scan per NEC and WA State amendments.
Roof Inspection & Condition Assessment
OverdueAnnual roof inspection to identify deficiencies, ponding water, membrane damage, and flashing failures.