Notifications

9-Day Reminder: Sprinkler System Semi-Annual Test

Due on Jun 1, 2026. NFPA 25

May 23, 2026·Deadline Reminder·View Obligation →

7-Day Reminder: Lead in Drinking Water Testing

Due in 7 days (May 30, 2026). RCW 43.70.830 — Lead in School Drinking Water

May 23, 2026·Deadline Reminder·View Obligation →

Overdue: IPM Annual OSPI Report

This obligation was due 23 days ago (Apr 30, 2026). Immediate attention required.

Apr 30, 2026·Overdue·View Obligation →

Overdue: AHERA 6-Month Periodic Surveillance

This obligation was due 38 days ago (Apr 15, 2026). Immediate attention required.

Apr 15, 2026·Overdue·View Obligation →

Overdue: Boiler Annual Safety Inspection

This obligation was due 52 days ago (Apr 1, 2026). Immediate attention required.

Apr 1, 2026·Overdue·View Obligation →

Overdue: Annual Fire Extinguisher Inspection

This obligation was due 69 days ago (Mar 15, 2026). Immediate attention required.

Mar 15, 2026·Overdue·View Obligation →

Overdue: Roof Inspection & Condition Assessment

This obligation was due 83 days ago (Mar 1, 2026). Immediate attention required.

Mar 1, 2026·Overdue·View Obligation →

Lead Result Above 5 ppb — Rm 205 Sink

Lead result: 7.1 ppb (WA DOH action level: 5 ppb). Outlet: Room 205 Sink. Fixture taken out of service pending remediation.

Feb 28, 2026·Threshold Alert·View Lab Results →

New Lab Results Available — Lead Water Testing

Blair Veridian uploaded and approved lead water lab results for your school. 6 outlets tested. View results in the Document Library.

Feb 28, 2026·Results Available·View Documents →

Overdue: AHERA Asbestos 3-Year Re-inspection

This obligation was due 111 days ago (Feb 1, 2026). Immediate attention required.

Feb 1, 2026·Overdue·View Obligation →

Overdue: WA CBPS Tier 2 Energy Benchmarking

This obligation was due 142 days ago (Jan 1, 2026). Immediate attention required.

Jan 1, 2026·Overdue·View Obligation →

Overdue: ADA Accessible Restroom Compliance

This obligation was due 142 days ago (Jan 1, 2026). Immediate attention required.

Jan 1, 2026·Overdue·View Obligation →

Document Awaiting Your Review — AHERA Surveillance Report

Blair Veridian submitted an AHERA 6-Month Surveillance Report for Shoreline Elementary. One finding (boiler room condition worsened to Significantly Damaged) requires your acknowledgment before distribution.

Nov 2, 2025·Pending Approval·

30-Day Reminder: Lead Paint Inspection & Risk Assessment

Due in 23 days (Jun 15, 2026). EPA RRP Rule / 40 CFR Part 745

May 23, 2026·Deadline Reminder·View Calendar →

30-Day Reminder: Indoor Air Quality Assessment

Due in 18 days (Jun 10, 2026). WAC 246-370 — Indoor Air Quality

May 23, 2026·Deadline Reminder·View Calendar →

WA DOH — Lead Testing Guidance Updated

Washington DOH released updated guidance on lead water testing for K-12 schools. Key change: outlet flush times standardized to 30 seconds. No action required before your next scheduled test.

Mar 1, 2026·Regulatory Alert·View Compliance →

ACM Condition Worsened — Mechanical Room Pipe Insulation

Condition changed from Damaged to Significantly Damaged during Nov 1 surveillance. Abatement contractor engaged. Room is sealed.

Nov 1, 2025·ACM Alert·View ACM Inventory →