AHERA asbestos management required
This building was constructed in 1968, before 1981. Federal law (AHERA) requires a triennial re-inspection every 3 years, a 6-month periodic surveillance walkthrough, and an annual notification letter to all parents and staff. Penalty: up to $25,000/day for non-compliance.
AHERA 6-Month Surveillance Report — Oct 2025
AHERA 6-Month Surveillance Report — Apr 2025
Lead in Drinking Water — Lab Results 2021
AHERA Annual Notification Letter — Sept 2025
AHERA Annual Notification Letter — Sept 2024
Radon Test Results — March 2025
IAQ Pre-Visit Preparation Checklist
Asbestos Management Plan — Shoreline Elementary