Shoreline Elementary School

PropertiesShoreline Elementary School

Shoreline Elementary School

schoolAHERA Required
11725 1st Ave NE, Shoreline, WA 98155
Built 1968
42,000 sq ft2 floors
5 overdue
4 due soon
2 open work orders
6 ACM records
8 documents
72%
Compliance Score

AHERA asbestos management required

This building was constructed in 1968, before 1981. Federal law (AHERA) requires a triennial re-inspection every 3 years, a 6-month periodic surveillance walkthrough, and an annual notification letter to all parents and staff. Penalty: up to $25,000/day for non-compliance.

Compliance Items (13)

View full compliance tracker

Annual Fire Extinguisher Inspection

OverdueNFPA 10 / IFC 906.2

All portable fire extinguishers must be inspected annually by a certified contractor per NFPA 10.

Due: Mar 15, 2026248 days overdueannualAssigned: Blair Veridian

Sprinkler System Semi-Annual Test

Due SoonNFPA 25

Wet pipe sprinkler system inspection and flow test per NFPA 25.

Due: Jun 1, 2026170 days overduesemi_annualAssigned: Blair Veridian

AIM Act Refrigerant Leak Detection Installation

Due SoonEPA AIM Act HFC Management Rule (2026)

EPA AIM Act HFC Management Rule requires automatic leak detection on systems ≥15 lbs refrigerant charge by Jan 1, 2027.

Due: Jan 1, 2027noneAssigned: Marcus Williams

WA CBPS Tier 2 Energy Benchmarking

OverdueWA CBPS Tier 2 / HB 1257 Expansion 2022

42,000 sq ft school — Tier 2 building. Must benchmark and implement O&M program by July 1, 2027.

Due: Jan 1, 2026321 days overdueannualAssigned: Marcus Williams

AHERA Asbestos 3-Year Re-inspection

OverdueEPA AHERA / 40 CFR Part 763

All K-12 schools must conduct asbestos re-inspections every 3 years per AHERA. Fines up to $25,000/day for non-compliance.

Due: Feb 1, 2026290 days overduetriennialAssigned: Marcus Williams

AHERA 6-Month Periodic Surveillance

OverdueAHERA — 40 CFR Part 763

Periodic surveillance of all asbestos-containing materials by AHERA-accredited inspector. Required every 6 months.

Due: Apr 15, 2026217 days overduesemi_annualAssigned: Blair Veridian

Lead in Drinking Water Testing

Due SoonRCW 43.70.830 — Lead in School Drinking Water

5-year testing cycle required for all K-12 schools. Community notification required after results per RCW 43.70.835.

Due: May 30, 2026172 days overdueannualAssigned: Blair Veridian

Indoor Air Quality Assessment

Due SoonWAC 246-370 — Indoor Air Quality

Annual IAQ walkthrough and assessment. Air Quality Response Plan required for wildfire smoke and HVAC failure events.

Due: Jun 10, 2026161 days overdueannualAssigned: Blair Veridian

IPM Annual OSPI Report

OverdueRCW 28A.320.278 — School IPM

Annual Integrated Pest Management report filed with OSPI each spring. 48-hour pesticide notification required.

Due: Apr 30, 2026202 days overdueannual

AHERA Annual Parent & Staff Notification

CompliantAHERA — 40 CFR Part 763.84

Annual notification letter to all parents and staff about asbestos management plan. Must be distributed before school year starts.

Due: Sep 1, 202678 days overdueannual

Radon Testing

CompliantEPA Radon Guidance — 4 pCi/L action level

Biennial radon testing. EPA action level: 4 pCi/L. NRPP-certified operator required.

Due: Mar 1, 2027biennialAssigned: Blair Veridian

IPM Annual Audit

CompliantRCW 28A.320.278 — School IPM

Annual Integrated Pest Management audit. WSDA Pesticide Consultant License required for operator.

Due: Nov 1, 202617 days overdueannualAssigned: Blair Veridian

AHERA 3-Year Re-Inspection

CompliantAHERA — 40 CFR Part 763

Full re-inspection of all asbestos-containing materials by an AHERA Management Planner. Required every 3 years per 40 CFR Part 763.

Due: Jun 1, 2027triennialAssigned: Blair Veridian